Skip to content
Request a demo

Rig Scheduling & Optimization Software

RigView streamlines rig scheduling by centralizing availability, status and utilization across multiple sites. Real-time integrations with WellView keep schedules current with operational progress, giving well delivery coordinators the tools to minimize downtime, align approvals and optimize deployment.

By consolidating schedules and resources in one platform, RigView drives higher rig productivity and lower operational costs.

Aerial view of a land drilling rig and its equipment on a well pad in open farmland

35+ YEARS

of energy expertise

700+ CLIENTS

worldwide

SOC 1 & 2 TYPE 2

security on Microsoft Azure

What Is Rig Schedule Optimization?

Rig schedule optimization is scheduling rigs across multiple sites against their availability, status, utilization and well readiness, so rigs are deployed effectively with less downtime.

When drilling schedules live in Microsoft Project, spreadsheets and PDFs, discrepancies between versions and disconnected reporting create inefficiencies in planning and execution, causing downtime and missed procurement deadlines.

RigView consolidates schedules and resources in one platform, and real-time integrations with WellView keep schedules current with operational progress.

Where Spreadsheet Rig Schedules Fall Short

The same six jobs, run two ways.

Rig scheduling: Microsoft Project, spreadsheets and PDFs compared with RigView.
JobMicrosoft Project, spreadsheets and PDFsRigView
Schedule versions

Discrepancies between versions

One schedule in a secure platform

Reporting

Disconnected reporting

Real-time visibility into rig status and availability

Planning

Inefficiencies in planning and execution

Better planning across departments

Integration

Well planning, reservoir modeling, AFE tracking and logistics affected

Integration with WellView and internal systems

Procurement

Missed procurement deadlines

Aligned procurement

Rig uptime

Downtime

Rigs deployed effectively, with reduced downtime

How Rig Schedule Optimization Works in Peloton

From scattered schedules to one plan every team works from, these are the steps.

  1. Centralize rig data

    Rig availability, status and utilization across multiple sites are consolidated into one secure platform in RigView.

  2. Connect to WellView

    Real-time integrations with WellView and internal systems keep schedules current with operational progress.

  3. Schedule rigs across sites

    Well delivery coordinators schedule rigs across multiple sites while monitoring availability, well readiness and performance in a centralized dashboard.

  4. Align approvals and resources

    Built-in coordination tools, such as approvals and resource requirements, keep teams and procurement aligned with the schedule.

  5. Optimize deployment

    With up-to-date utilization data, coordinators minimize downtime and optimize deployment for higher rig productivity.

Crew member walking toward a land drilling rig on its pad at dusk

Coordinating Rig Resources for Maximum Uptime

With access to up-to-date utilization data and built-in coordination tools, such as approvals and resource requirements, RigView reduces downtime and ensures rigs are deployed effectively, for greater rig productivity and lower operational costs.

Optimizing Operational Schedules Across Regions

A U.S. oil and gas operator scheduling rigs across multiple regions.

Challenge

A U.S. oil and gas operator relied on Microsoft Project, spreadsheets and PDFs to manage drilling schedules across multiple regions. Discrepancies between versions and disconnected reporting created inefficiencies in planning and execution. The lack of integration affected well planning, reservoir modeling, AFE tracking and logistics, causing downtime and missed procurement deadlines.

Solution

The operator implemented RigView to centralize and streamline rig scheduling. By consolidating rig data into a secure platform, it improved cross-team coordination, gained real-time visibility into rig status and availability, and enabled better planning across departments.

Outcome

Integration with WellView and internal systems ensured consistency, reduced downtime and enhanced capital efficiency through optimized resource scheduling and aligned procurement.

  • One rig schedule across regions
  • Real-time visibility into rig status and availability
  • Reduced downtime and aligned procurement

RigView: Rig Scheduling in One Platform

RigView consolidates schedules and resources in one platform, integrated with WellView.

RigView

Rig availability, status and utilization across multiple sites, with built-in approvals, resource requirements and a centralized dashboard.

  • Rig availability and status
  • Utilization data
  • Centralized scheduling dashboard
  • Approvals and resource requirements
  • Real-time WellView integration
  • Secure, centralized rig data

Rig Scheduling Questions

What is rig scheduling software?

Rig scheduling software centralizes rig availability, status and utilization across multiple sites in one schedule. Peloton RigView gives well delivery coordinators the tools to minimize downtime, align approvals and optimize deployment, and its real-time integrations with WellView keep schedules current with operational progress.

How does RigView keep rig schedules current?

Peloton RigView has real-time integrations with WellView and internal systems, so schedules stay current with operational progress. Well delivery coordinators monitor availability, well readiness and performance in a centralized dashboard while they schedule rigs across multiple sites.

What goes wrong when rig schedules live in spreadsheets?

One U.S. operator relied on Microsoft Project, spreadsheets and PDFs to manage drilling schedules across multiple regions. Discrepancies between versions and disconnected reporting created inefficiencies, and the lack of integration affected well planning, reservoir modeling, AFE tracking and logistics, causing downtime and missed procurement deadlines until it moved to Peloton RigView.

How does RigView reduce rig downtime?

With access to up-to-date utilization data and built-in coordination tools, such as approvals and resource requirements, Peloton RigView reduces downtime and ensures rigs are deployed effectively. Consolidating schedules and resources in one platform drives higher rig productivity and lower operational costs.

Who uses RigView to schedule rigs?

Well delivery coordinators use Peloton RigView to schedule rigs across multiple sites while monitoring availability, well readiness and performance in a centralized dashboard. With rig data in one secure platform, teams across departments share real-time visibility into rig status and availability and plan together.

What Customers Say About Working with Peloton

It was the easiest SaaS migration I’ve ever done. Less than a week. I was able to sleep at night. These guys are the partner I should have gone with from the start for every part of my business.

– D&C Manager

Integrating failure tables gave us a foundation for managing well work—from notifications to cost tracking and root cause analysis.

– Senior Production Tech

Peloton puts more real-time R&D in their products than any other oil and gas software vendor out there, and I have used a lot of them.

– Engineering Technician

See Rig Schedule Optimization in Action

See how RigView brings rig availability, status and utilization into one schedule, kept current with WellView.

Request a RigView Demo

A Peloton specialist will follow up to schedule.